Log cabin floor plans 3 (Part 6)
CONSTRUCTION OUTLINE
Foundation: Piers made of 8-by-8-by-16-inch block. Top block poured solid and bolts put into place to receive sill.
Flooring: Sills drilled to take bolts and then placed on pier foundation. Tighten bolts. Spike inner width of header to sill. Lay out floor joists and spike them to inner width. Nail down flooring. Install door and window sills and lay sole around outer edge and under partitions.
Wall Framing: Lay out wall sections A and C on the floor. When completed, tip into place and use temporary bracing to hold in vertical position. Frame walls B and D.
Roof: Place roof joists in place and lay roofing boards. Coat roofing boards with asphalt cement. Place a layer of 15-pound roofing felt over. Use cold type of roof mastic and brush over felt. Start laying selvage edge of roofing material at end A. Follow directions on the roll.
Side-wall Finish: Use l-by-6- or l-by-8-inch tongue-and-groove siding nailed at top, bottom, and at herringbone bridging.
Vents, Doors, and Other Openings: Follow details on preceding pages or in special details.
Insulation: Medium- or full-thickness Fiberglas or equivalent stapled between roof joists. Use medium thickness in side walls. Finish interior to suit. Install mechanical and electrical equipment as desired.
MATERIALS LIST
Concrete for footings������� 1/2 cu yd-
Block for piers������������� depends upon depth
8 anchor bolts�������������� 1/2 m- x 8 in.
6��� 2x6���� 10 ft. long���� sill and� door sill
2��� 2x6���� 12 ft. long���� header over double doors
10�� 2x4���� 14 ft. long���� cut in half for rear wall
22�� 2x4���� 16 ft. long���� cut for other wall framing and partitions
6��� 2x4���� 10 ft. long���� plates and� headers� (window)
18�� 2x8���� 14 ft. long���� floor joists
16�� 2x8���� 16 ft. long���� rafters
8��� 2x8���� 10 ft. long���� header (girder)
1��� 4x4����� 8 ft. long���� door post
80 lineal ft. of 1� x 8 fascia board
60 ft. 1� x 2� 14 ft. long doorstops
400� board� ft. of flooring
450 board ft. of roofing� boards
600� board� ft. of tongue-and-groove siding�� (vertical)
800� board� ft. of tongue-and-groove� boards� (interior finish) or 800 sq. ft. of 3/8 in. plywood
280 sq. ft., plus waste, material for ceiling
2 pairs of 2 ft. 6 in. x 6 ft. 8 in. single-panel doors
1�� 2 ft. 4 in. x 6 ft. 6 in. interior (bath)� door
1 pair of wood or steel sliding doors, opening 5 ft. x 6 ft. 6 in.
1,100 sq. ft. of roofing material (3-ply built-up) and mastic
800 sq. ft. medium-thick insulation
3 cellar sash� (about 16 in. x 33 in.)
60 sq. ft. of 3/4 in. plywood for counter
3 ft. x 5 ft. piece of� 5/8 "� waterproof plywood for table
Electric wiring:�� 110-220 volt, 3-wire system
Plumbing: piping, pump, tank, water heater, water closet, basin, shower, and single sink
Septic tank
Stove or range
Refrigerator�